Wooden house in Vienna
The wooden house in Vienna is one of our most difficult completed projects, but also one of the most satisfying as a final result. The terrain of the site had a huge vertical drop, without the possibility for access of equipment and therefore all the work such as removal of materials, lifting and placement was done manually.
Basic construction and finishing works
Our work on the Vienna house included the overall construction, including the finishing works. We managed within 4 months to do everything that was required of us, achieving a very good result and leaving satisfied customers.
The house consists of two floors, and on the first floor are located: a living room, a kitchen, a study and a bathroom with a toilet. On the second floor there are three bedrooms, a wardrobe room, as well as two bathrooms with a toilet.
Project Information:
- Total floorage: 234 m2
- 1st floor: a living room, a study, a kitchen, a bathroom with a toilet;
- 2nd floor: 3 bedrooms, wardrobe, 2 bathrooms with a toilet.
- Construction technology of the external walls: Eco 2
- Year of construction: 2015
- Construction period: 4 months
Share this project
Check out other completed projects
The house in Tryavna is a modern one-storey building consisting of a living room with a kitchen, two bedrooms, two bathrooms with a toilet and an entrance hall. Our work on the house included the overall construction, as well as the external walls, which are built according to ECO 2 technology. The complete construction took us 3.5 months.
Wooden house in Tryavna
The prefabricated eco house in Ivanyane is a practical and comfortable family house on two floors, built in 2018-2019. It is built according to ECO 3 technology, guaranteeing warmth and low heating costs.